top of page

SÜleyman
hİlmİ gül.

Senior Structural Engineer

Multidisciplinary Civil Engineer with 13+ years of experience in structural engineering, project management, and site operations. Proven expertise in delivering end-to-end engineering services—from static project design and performance analysis to site
supervision and retrofitting. Combines advanced technical proficiency with leadership in facility management, offering a highly analytical approach to complex construction and infrastructure projects.

educatıon

Academic Background: A multidisciplinary foundation bridging Civil Engineering, Architectural design, and Business Management. The theoretical framework that drives a comprehensive approach to the construction industry.

KTU

Blacksea Technical University

Bachelor of Science in Civil Engineering

Anadolu University

Bachelor of Science in Business Administration

Anadolu University

Associate Degree in Theology

468421972_10161277234982605_7122311365179961948_n.jpg

01 PROFESSIONAL

Primavera P6

AutoCad
Sta4Cad
SAP2000
Google SketchUp
PhotoShop,Illustrator,InDesign
Fireworks, CorelDraw
MS Office
Web Dev

(HTML, PHP, C#)

SOFTWARE

CORE STRENGTHS

  • Structural Analysis & DesignSeismic

  • Performance AssessmentStructural

  • RetrofittingDamage Assessment

PROFESSIONAL 
EXPERIENCEO

03 Experience

2013-Present

Civil Engineering
  • Güneş Construction Inc.

  • Mincanlar Quarry & Mining Co.

  • Bayraktar Building Inspection Inc.

  • Dolunay Building Inspection Inc.

  • Yeni Denge Building Inspection Inc.

  • MYK Const.

End-to-End Construction Management (25+ Projects)

Successfully managed the complete construction of over 25 projects, from initial foundation and structural modeling to final roof assembly and securing permits.Coordinated multi-disciplinary teams, managed site supervision, and ensured strict adherence to municipal building codes and safety regulations throughout all project phases.

Static Project Design (30+ Projects)

Led the end-to-end static design and structural analysis of complex building projects using STA4CAD and AutoCAD.

Generated comprehensive technical reports, precise structural blueprints, and detailed load calculations.

Delivered safe and cost-effective structural solutions, strictly aligning with local building codes and architectural specifications.

Seismic Performance Analysis (45+ Projects)

Conducted comprehensive seismic performance analyses and structural damage assessments for a total of 45+ structures.
Actively deployed to the disaster regions following the 2023 earthquakes for over a month, executing critical on-site damage assessments and Perf. Analysis for 30+ buildings to evaluate structural integrity and ensure public safety.

Retrofitting-Reinforcement Projects

Engineered and managed end-to-end structural retrofitting projects, successfully designing targeted seismic reinforcement solutions for buildings located in Gaziantep and Trabzon.
Provided hands-on site supervision and technical management during the field implementation of the reinforcement projects, ensuring strict adherence to static design blueprints and current seismic codes.

02 PORTFOLIO

Portfolio
Proje Listesi.jpg
Tirebolu Kindergarten Project

•Location: Turkey,Giresun,Tirebolu

•Site Area (Land Area): 1582 m2
•Total Gross Floor Area (GFA): 1500 m2
•Construction Period (T imeline): 2026-
•Capacity: 120
•Role & Scope: Lead Engineer (Project Manager)
•Project Status: Under Construction

Ortahisar Educational, Residential, Commercial Complex

Project Name: Süleymaniye Mixed-Use
Educational, Residential, and Commercial
Complex
Location: Ortahisar, Trabzon
Site Area: 5,178 m2
Total Gross Floor Area (GFA): 7,645 m2
Structural System: 6-Storey Reinforced
Concrete Dual-Block Frame (1 B + G + 4F)
Functional Breakdown:
Block A (Residential): 120-Capacity
Dormitory
Block B (Commercial): Professional
Corporate & Administrative Offices
Key Social & Civic Facilities:
800 m2 Banquet / Event Hali
750 m2 Mosque
600 m2 Conference Hail
600 m2 Underground Parking Garage
Sustainable lnfrastructure: Solar Energy
System & Greywater Harvesting
Role & Scope: Lead Structural Engineer Project Manager
• Project Status: Under Construction
(Superstructure Works in Progress)

Görele Kindergarten Project

• Location: Turkey,Giresun,Görele
• Site Area (Land Area): 1164 m2
•Total Gross Floor Area (GFA): 600 m2
• Construction Period (T imeline): 2025-
• Capacity: 60
• Role & Scope: Lead Engineer (Project
Manager)
• Project Status: Under Construction

Giresun İsabet Comprehensive Educational Campus

• Location: Turkey,Giresun
• Site Area (Land Area): 1652,80 m2 + 800 m2
Total Gross Floor Area (GFA): 5800 m2
• Project Drawing-Structural Design: 2025
• Educational Levels: Kindergarten, Primary
School, and Middle School
• lntegrated Facilities: Student Dormitory,
lndoor Sports Hali, Conference Auditorium,
and Dining Hali
• Capacity: 620 (Kindergarten: 170, Primary:
200, Middle: 200 Students, Student
Dormitory: 50 Beds)
• Role & Scope: Lead Engineer (Project
Manager)
• Project Status: Ongoing Construction
(Building Permit Obtained & Earthworks
Completed)

Çarşıbaşı 65-Bed Private Student Residence (Dormitory)

• Location: Turkey,Trabzon,Çarşıbaşı
• Site Area (Land Area): 675 m2
• Total Gross Floor Area (GFA): 1705 m2
• Construction Period (Timeline): 2025-
• Capacity: 65
• Role & Scope: Lead Engineer (Project
Manager)
• Project Status: Underconstruction

Yomra Kindergarten Project

• Location: Turkey,Trabzon,Yomra
• Site Area (Land Area): 380 m2
• Total Gross Floor Area (GFA): 780 m2
• Construction Period (Timeline): 2023-2026
• Capacity: 84
• Role & Scope: Lead Engineer (Project
Manager)
• Project Status: Nearly Completed

Teyyaredüzü 122-Bed Private Student Residence (Dormitory)

• Location: Turkey,Giresun
• Site Area (Land Area): 1966 m2
• Total Gross Floor Area (GFA): 3200 m2
• Construction Period (Timeline): 2020-
• Capacity: 122
• Role & Scope: Lead Engineer (Project
Manager)
• Project Status: Underconstruction

Şalpazarı Commercial and Residential Building

• Location: Turkey,Trabzon,Şalpazarı
Site Area (Land Area): 453 m2
Total Gross Floor Area (GFA): 1880 m2
• Construction Period (Timeline): 2009-
• Role & Scope: Lead Engineer (Project
Manager)
• Project Status: Started after Long Break

Espiye 88-Bed Private Student Residence (Dormitory)

• Location: Turkey,Giresun,Espiye
• Site Area (Land Area): 801 m2
• Total Gross Floor Area (GFA): 1727 m2
• Construction Period (Timeline): 2024-2026
• Capacity: 88
• Role & Scope: Lead Engineer (Project
Manager)
• Project Status: Completed

Görele 82-Bed Private Student Residence (Dormitory)

• Location: Turkey,Giresun,Görele
• Site Area (Land Area): 1164 m2
• Total Gross Floor Area (GFA): 2280 m2
• Construction Period (T imeline): 2022-
• Capacity: 82
• Role & Scope: Lead Engineer (Project
Manager)
• Project Status: Completed

Kaymaklı 76-Bed Private Student Residence (Dormitory)

• Location:
Turkey,Trabzon,Ortahisar,Özkaymaklı
• Site Area (Land Area): 1279 m2
• Total Gross Floor Area (GFA): 1921 m2
• Construction Period (T imeline): 2023-2026
• Capacity: 76
• Role & Scope: Lead Engineer (Project
Manager)
• Project Status: Completed

Bayburt Kindergarten Project

• Location: Turkey,Bayburt
• Site Area (Land Area): 450 m2
• Total Gross Floor Area (GFA): 750 m2
• Construction Period (T imeline): 2024-2025
• Capacity: 76
• Role & Scope: Lead Engineer (Project Manager)
• Project Status: Completed

Bulancak Kindergarten Project

• Location: Turkey,Giresun,Bulancak
• Site Area (Land Area): 478 m2
• Total Gross Floor Area (GFA): 1100 m2
• Construction Period (T imeline): 2021-2024
• Capacity: 60
• Role & Scope: Lead Engineer (Project
Manager)
• Project Status: Completed

Trabzon Araklı Private School

• Location: Turkey,Trabzon,Araklı
• Site Area (Land Area): 5262,92 m2
• Total Gross Floor Area (GFA): 1600 m2
• Construction Period (T imeline): 2021-2023
• Capacity: 200
• Role & Scope: Lead Engineer (Project Manager)
• Project Status: Completed

Çanakçı 62-Bed Private Student Residence (Dormitory)

• Location: Turkey,Giresun,Çanakçı
• Site Area (Land Area): 345 m2
• Total Gross Floor Area (GFA): 1392 m2
• Construction Period (Timeline): 2014-2022
• Capacity: 62
• Role & Scope: Lead Engineer (Project Manager)
• Project Status: Completed

Yalıncak 64-Bed Private Student Residence (Dormitory)

• Location: Turkey,Trabzon,Ortahisar,Yalıncak
• Site Area (Land Area): 811 m2
• Total Gross Floor Area (GFA): 1830 m2
• Construction Period (Timeline): 2014-2020
• Capacity: 64
• Role & Scope: Lead Engineer (Project Manager)
• Project Status: Completed

Araklı 76-Bed Private Student Residence (Dormitory)

• Location: Turkey,Trabzon,Araklı
• Site Area (Land Area): 390 m2
Total Gross Floor Area (GFA): 1867 m2
• Construction Period (Timeline): 2016-2019
• Capacity: 76
• Role & Scope: Lead Engineer (Project Manager)
• Project Status: Completed

Bahçeçik Kindergarten Project

• Location: Turkey,Trabzon,Ortahisar
• Site Area (Land Area): 394 m2
• Total Gross Floor Area (GFA): 800 m2
• Construction Period (Timeline): 2017-2018
• Capacity: 72
• Role & Scope: Lead Engineer (Project Manager)
• Project Status: Completed

Teyyaredüzü Kindergarten Project

• Location: Turkey,Giresun
• Site Area (Land Area): 440 m2
• Total Gross Floor Area (GFA): 1200 m2
• Construction Period (Timeline): 2015-2017
• Capacity: 90
• Role & Scope: Lead Engineer (Project Manager)
• Project Status: Completed

Doğankent 50-Bed Private Student Residence (Dormitory)

• Location: Turkey,Giresun,Doğankent
• Site Area (Land Area): 315 m2
• Total Gross Floor Area (GFA): 903 m2
• Construction Period (Timeline): -
• Capacity: 50
• Role & Scope: Lead Engineer (Project Manager)
• Project Status:not yet started

CONTACT

Let's Build What Comes Next.

Open to structural engineering, project management, construction and technology-driven engineering opportunities.

Feel free to reach out

suleymanhilmigul@gmail.com

+90 542 362 34 55

  • White LinkedIn Icon
  • White Facebook Icon
  • White Twitter Icon
  • White Tumblr Icon
  • Youtube
  • About.me

© 2026 by Süleyman Hilmi GÜL | Senior Structural Engineer | SlymNGL | İnşaat Mühendisi

bottom of page